Storm Damage Repair

This house was damaged on September 19, 2012 caused by wind gusts of 65mpb.

We were able to fully restore this roof to original new condition.  The job consisted of completely removing the shingles and tar paper and replacing with new.  The total job time was 1 day.  The customer was very satisfied in the response time and completion time.  This is an example of what we do on a common basis.